Western Gas Resources
Kingsbury Pipeline
Wyoming
|
Provided engineering, design, and fabrication of a 22 mile, 12” pipeline, ANSI 900 Launcher, Receiver, and Mainline Valve. Project Scope included generation of alignment sheets including survey data and topographic integration and mapping, all drawings including piping, crossings, and hydrotest, material take-off spreadsheet, procurement of fabricated assemblies materials, preparation of bid packages, and Job Data Book.
|
Bullwhacker Pipeline
Wyoming |
Provided engineering, design, and fabrication of a 23 mile, 12” pipeline, ANSI 900 Launcher, Receiver, and Mainline Valve. Project Scope included generation of alignment sheets including survey data and topographic integration and mapping, all drawings including piping, crossings, and hydrotest, material take-off spreadsheet, procurement of fabricated assemblies materials, preparation of bid packages, and Job Data Book.
|
Carr Draw Pipeline
Wyoming |
Provided engineering, design, and fabrication of 19 miles of 12” and 7.5 miles of 16” pipeline, 12” ANSI 900 Launcher and Receiver, 16” ANSI 900 Launcher, Receiver, and Mainline Valve. Project Scope included generation of alignment sheets including survey data and topographic integration and mapping, all drawings including piping, crossings, and hydrotest, material take-off spreadsheet, generation of property plats and legal descriptions, preparation of bid packages, procurement of fabricated assemblies materials, and Job Data Book.
|
Rendezvous Phase 5 Pipeline
Wyoming |
Provided engineering and design of a 21 mile, 20” pipeline, ANSI 600 Launcher, Receiver, and Mainline Valve. Project Scope included generation of alignment sheets including survey data and topographic integration and mapping, all drawings including piping, crossings, and hydrotest, material take-off spreadsheet, and coordination of FERC Application. Project is currently waiting on FERC approval.
|
Rendezvous Bird Canyon Jumper
Wyoming |
Provided engineering, design, and fabrication of a 16” to 12” jumper line, and a 4” meter skid addition. Project Scope included generation of drawings, coordination of fabrications and installation, and preparation of Job Data Book.
|
Rendezvous Bird Canyon Receiver
Wyoming
|
Provided engineering and design of a 12” Receiver, 12” Piping Spool, and an Anchor Flange Assembly. Project Scope included generation of drawings, procurement of material, preparation of bid packages, and Job Data Book. Project is currently out for bid.
|
Amherst Trailblazer Interconnect
Colorado |
Provided engineering, fabrication, and installation of a meter skid, and associated on-site piping. Project Scope included generation of drawings, procurement of material, coordination of fabrication and installation, and Job Data Book.
|
Kinder Morgan
Conn Creek Interconnect
Colorado |
Provided engineering, design, and fabrication of a 6” meter skid. Project Scope included generation of piping and structural drawings, procurement of material, preparation of bid packages, coordination of fabrication, and Job Data Book.
|
Logan Wash Interconnect
Colorado |
Provided engineering, design, and fabrication of a 12” meter skid, 8” dual run flow control valve skid, and 8’ x 16’ dual room control/chromatograph building. Project Scope included generation of piping and structural drawings, procurement of material, preparation of bid packages, coordination of fabrication, and Job Data Book.
|
Quinn Draw Interconnect
Colorado |
Provided engineering, design, and fabrication of a 6” meter skid, and 8’x 8’ control building. Project Scope included generation of piping and structural drawings, procurement of material, preparation of bid packages, coordination of fabrication and installation, and preparation of Job Data Book.
|
Optigas
Deadhorse Interconnect
Wyoming
|
Provided engineering, design, and fabrication of a 6” meter skid, 20” 75 MM coalescing filter skid, chromatograph building, and ASME coalescing filter. Project Scope included generation of all drawings, procurement of materials, coordination of fabrication, and Job Data Book.
|
Ft. Union
Stock Receipt Point
Wyoming |
Provided engineering, design, and fabrication of a 6” meter skid, climate controlled dual room chromatograph building & skid, 100 MM coalescing filter skid, and ASME coalescing filter. Project Scope included generation of all drawings, procurement of materials, coordination of fabrication, and Job Data Book.
|
NRG Gathering
Slater Dome Pipeline
Colorado/Wyoming
|
Provided engineering, design, and inspection of an 18 mile, 6” pipeline, Meter Skid, Launcher, and Receiver. Project Scope included generation of alignment sheets including survey data and topographic integration and mapping, all drawings including piping, crossings, and hydrotest, material take-off spreadsheet, Road Crossing Permit Applications, and Job Data Book.
|
Xcel Energy
Marshall Compressor Station-
Discharge Coalescing Filters
Colorado |
Provided engineering, design, and fabrication of two 33 MMSCFD discharge coalescing filters. Project Scope included vessel calculations per ASME Section VIII, Div. 1, drawings, procurement of materials, coordination of fabrication, and Job Data Book.
|
Kerr-McGee Rocky MountainCorp.
Bonanza Process Plant-
Gas Scrubber Vessel
Utah |
Provided engineering, design, and fabrication of a 50 MMSCFD dry gas scrubber vessel. Project Scope included vessel calculations per ASME Section VIII, Div. 1, drawings, procurement of materials, coordination of fabrication, and Job Data Book.
|
 |
 |
|